Updated June 2026

Statewide Performance Results

Delivering Results that Improve Your Mobility and Quality of Life

PennDOT oversees programs and policies affecting highways, urban and rural public transportation, airports, railroads, ports, and waterways. More than three-quarters of PennDOT's annual budget is invested in Pennsylvania's approximately 122,000 miles of state and local highways and 32,000 state and local bridges. PennDOT is directly responsible for 40,000 miles of highway and over 25,400 bridges, a system first established in 1911.

 

PennDOT's Driver and Vehicle Services administers the state's nearly 12 million vehicle registrations and 10.2 million driver's licenses and IDs. We also oversee Pennsylvania's safety and emission inspection programs.

 

A comprehensive summary of accomplishments and funding usage can be found in our annual report.

Workers paving a road

PennDOT Accomplishments

Annually across the Commonwealth, thousands of projects are let, designed, constructed, and opened for public use. This dashboard provides annual and monthly data on current PennDOT activities. 

Under Governor Josh Shapiro’s Administration, 20,538 miles of road have been improved statewide and work has advanced on 1,898 state and local bridges

Each month, PennDOT reports miles improved and paved, and bridges improved.

For pavements, miles improved includes seal coats, micro-surfacing, thin lift paving, and regular paving conducted both by department force and contractors. Paved miles are only those receiving a new resurfacing. Once the projects are completed, they are closed and entered in our databases. However, oftentimes improvements and paving projects have additional work items that need to be completed, and all payments and accounting must be finalized before the projects are closed. Therefore, the reported improved miles or paving may be well after the paving or improvement portion of the project has been completed.

For bridge improvement, PennDOT reports projects that are "let," which means that they were made available for bid. Bridge projects sometimes span many years, so the most reliable means of measuring the progress of our program is reporting how many bridges are let in a given period.

2026 Year-to-Date Statewide Accomplishments

Last Updated June 2026

Reference: * Asterisk indicates data from January 1, 2026 - June 30, 2026  |   + Plus symbol  indicates projects currently underway and those expected to start or go out for bid this year 

Handshake

94

Construction Contracts for Highway/Bridge/Other Improvements Completed by Private-Sector Partners*

illustration of a hardhat

1,468

Projects +

illustration of a dollar

$13.71

Billion in Projects +

illustration of a steamroller

526

Miles Paved*

Illustration of a road with a star award on it

1,355

Total Miles Improved by Department or Partner Crews (Including Paving)*

illustration of a handshake

283

State and Locally Owned Bridges Let to be Repaired, Preserved, or Replaced by PennDOT or Industry Forces*

2025 Statewide Highlights

illustration of a handshake

443

Bridges Let to be Repaired, Replaced, or Preserved by PennDOT or Industry Forces

illustration of a steamroller

2,274

Miles Paved

Illustration of a road with a star award on it

6,262

Total Miles Improved by PennDOT or Partner Crews (Including Paving)

illustration of a dollar

56,865

Customer Care Center Concerns Resolved by PennDOT

Learn More

PennDOT workers engaged in their work

See projects happening or planned near you at PennDOT's Project Website.

The number of state-owned bridges in poor condition has decreased from a high of 6,034 in 2008 to 2,041. See the condition of bridges near you on our Bridge Conditions Map.

Results Near You

PennDOT has 11 engineering districts that help manage travel across the Commonwealth.  Each has its own unique challenges and needs, and we are grateful for the hardworking members of each district who work to make transportation across the Commonwealth safe and efficient.

The map below shows how Pennsylvania's counties are broken up by district.  Users can view updated results for each of our engineering districts by using the tabs below the map.

Map of Pennsylvania divided by counties and PennDOT engineering districts

PennDOT Regional Offices (Engineering Districts)

Last Updated June 2026

Use arrow keys to choose tabs. Content for the chosen tab will be revealed below.

Year-to-Date Accomplishments: District 1

District 1 Represents:

Crawford County, Erie County, Forest County, Mercer County, Venango County, and  Warren County in Northwest PA. 

Reference: * Asterisk indicates data from January 1, 2026 - June 30, 2026  |   + Plus symbol  indicates projects currently underway and those expected to start or go out for bid this year 

illustration of a hardhat

111

Projects +

illustration of a dollar

$556.1

Million in Projects +

hardhat

12

Construction Contracts Completed*

illustration of a steamroller

25.99

Miles Paved*

Illustration of a road with a star award on it

55.11

Total Miles Improved by Department or Partner Crews (Including Paving)*

illustration of a handshake

48

Bridges Repaired, Preserved, or Replaced*

Year-to-Date Accomplishments: District 2

District 2 Represents:

Cameron County, Centre County, Clearfield County, Clinton County, Elk County, Juniata County, McKean County, Mifflin County, and Potter County

Reference: * Asterisk indicates data from January 1, 2026 - June 30, 2026  |   + Plus symbol  indicates projects currently underway and those expected to start or go out for bid this year 

illustration of a hardhat

101

Projects +

illustration of a dollar

$586

Million in Projects +

hardhat

9

Construction Contracts Completed*

illustration of a steamroller

11.71

Miles Paved*

Illustration of a road with a star award on it

46.98

Total Miles Improved by Department or Partner Crews (Including Paving)*

illustration of a dollar

58

Bridges Repaired, Preserved, or  Replaced*

Year-to-Date Accomplishments: District 3

District 3 Represents:

Bradford County, Columbia County, Lycoming County, Montour County, Northumberland County, Snyder County, Sullivan County, Tioga County, and Union County

Reference: * Asterisk indicates data from January 1, 2026 - June 30, 2026  |   + Plus symbol  indicates projects currently underway and those expected to start or go out for bid this year 

illustration of a hardhat

135

Projects +

illustration of a dollar

$591.7

Million in Projects +

hardhat

10

Construction Contracts Completed*

illustration of a steamroller

19.59

Miles Paved*

Illustration of a road with a star award on it

112.58

Total Miles Improved by Department or Partner Crews (Including Paving)*

illustration of a dollar

35

Bridges Repaired, Preserved, or Replaced*

Year-to-Date Accomplishments: District 4

District 4 Represents:

Lackawanna County, Luzerne County, Pike County, Susquehanna County, Wayne County, and Wyoming County

Reference: * Asterisk indicates data from January 1, 2026 - June 30, 2026  |   + Plus symbol  indicates projects currently underway and those expected to start or go out for bid this year 

illustration of a hardhat

167

Projects +

illustration of a dollar

$1.17

Billion
in Projects +

hardhat

4

Construction Contracts Completed*

illustration of a steamroller

2.22

Miles Paved*

Illustration of a road with a star award on it

3.28

Total Miles Improved by Department or Partner Crews (Including Paving)*

illustration of a handshake

27

Bridges Repaired, Preserved, or Replaced*

Year-to-Date Accomplishments: District 5

District 5 Represents:

Berks County, Carbon County, Lehigh County, Monroe County, Northampton County, and Schuylkill County

Reference: * Asterisk indicates data from January 1, 2026 - June 30, 2026  |   + Plus symbol  indicates projects currently underway and those expected to start or go out for bid this year 

illustration of a hardhat

145

Projects +

illustration of a dollar

$1.22

Billion
in Projects +

hardhat

9

Construction Contracts Completed*

illustration of a steamroller

21.22

Miles Paved*

7.31

Illustration of a road with a star award on it

23.21

Total Miles Improved by Department or Partner Crews (Including Paving)*

Total Miles Improved by Department or Partner Crews (Including Paving)*

illustration of a handshake

11

Bridges Repaired, Preserved, or Replaced*

Year-to-Date Accomplishments: District 6

District 6 Represents:

Bucks County, Chester County, Delaware County, Montgomery County, and Philadelphia County

Reference: * Asterisk indicates data from January 1, 2026 - June 30, 2026  |   + Plus symbol  indicates projects currently underway and those expected to start or go out for bid this year 

illustration of a hardhat

146

Projects +

illustration of a dollar

$4.2

Billion in Projects +

hardhat

10

Construction Contracts Completed*

Illustration of a road with a star award on it

149.52

Total Miles Improved by Department or Partner Crews (Including Paving)*

illustration of a handshake

21

Bridges Repaired, Preserved, or Replaced*

Year-to-Date Accomplishments: District 8

District 8 Represents:

Adams County, Cumberland County, Dauphin County, Franklin County, Lancaster County, Lebanon County, Perry County, and York County

Reference: * Asterisk indicates data from January 1, 2026 - June 30, 2026  |   + Plus symbol  indicates projects currently underway and those expected to start or go out for bid this year 

illustration of a hardhat

128

Projects +

illustration of a dollar

$2.4

Billion
in Projects +

hardhat

6

Construction Contracts Completed*

illustration of a steamroller

15.61

Miles Paved*

Illustration of a road with a star award on it

64.83

Total Miles Improved by Department or Partner Crews (Including Paving)*

illustration of a handshake

8

Bridges Repaired, Preserved, or Replaced*

Year-to-Date Accomplishments: District 9

District 9 Represents:

Bedford County, Blair County, Cambria County, Fulton County, Huntingdon County, and Somerset County

Reference: * Asterisk indicates data from January 1, 2026 - June 30, 2026  |   + Plus symbol  indicates projects currently underway and those expected to start or go out for bid this year 

illustration of a hardhat

103

Projects +

illustration of a dollar

$315.4

Million in Projects +

hardhat

6

Construction Contracts Completed*

Illustration of a road with a star award on it

9.21

Total Miles Improved by Department or Partner Crews (Including Paving)*

illustration of a handshake

36

Bridges Repaired, Preserved, or Replaced*

Year-to-Date Accomplishments: District 10

District 10 Represents:

Armstrong County, Butler County, Clarion County, Indiana County, and Jefferson County

Reference: * Asterisk indicates data from January 1, 2026 - June 30, 2026  |   + Plus symbol  indicates projects currently underway and those expected to start or go out for bid this year 

illustration of a hardhat

66

Projects +

illustration of a dollar

$438.6

Million in Projects +

hardhat

4

Construction Contracts Completed*

illustration of a steamroller

109.78

Miles Paved*

Illustration of a road with a star award on it

361.35

Total Miles Improved by Department or Partner Crews (Including Paving)*

illustration of a handshake
bridge

1

Bridges Repaired, Preserved, or Replaced*

Year-to-Date Accomplishments: District 11

District 11 Represents:

Allegheny County, Beaver County, and Lawrence County

Reference: * Asterisk indicates data from January 1, 2026 - June 30, 2026  |   + Plus symbol  indicates projects currently underway and those expected to start or go out for bid this year 

illustration of a hardhat

80

Projects +

illustration of a dollar

$1

Billion in Projects +

illustration of a dollar

4

Construction Contracts Completed*

illustration of a steamroller

71

Miles Paved*

Illustration of a road with a star award on it

215.46

Total Miles Improved by Department or Partner Crews (Including Paving)*

bridge

14

Bridges Repaired, Preserved, or Replaced*

Year-to-Date Accomplishments: District 12

District 12 Represents:

Fayette County, Greene County, Washington County, and Westmoreland County

Reference: * Asterisk indicates data from January 1, 2026 - June 30, 2026  |   + Plus symbol  indicates projects currently underway and those expected to start or go out for bid this year 

illustration of a hardhat

98

Projects +

illustration of a dollar

$664.1

Million in Projects +

hardhat

10

Construction Contracts Completed*

illustration of a steamroller

90.67

Miles Paved*

Illustration of a road with a star award on it

313.95

Total Miles Improved by Department or Partner Crews (Including Paving)*

bridge

24

Bridges Repaired, Preserved, or Replaced*

Photo of the port of Philadelphia from above. The image shows hundreds of shipping containers as well as a series of container lifts that read "PhilaPort" on the side.

Multimodal Transportation

The Multimodal Deputate at PennDOT provides financial support and oversight for major transportation initiatives.  From airports to the Port of Philadelphia; from passenger rail to the sidewalks and bike lanes across the Commonwealth— multimodal transportation touches many aspects of every day life for PA residents and travelers alike.

2025 Multimodal Highlights

280 Million

Fixed-Route Bus Trips

illustration of commuter train

65

Operating Railroads

illustration of train track

6,800

Miles of Railroad Tracks

119

Licensed Public Airports / Heliports

225+

Private Port Terminals and Waterborne Businesses

Statewide Multimodal Initiatives

Use arrow keys to choose tabs. Content for the chosen tab will be revealed below.

Senior Travel Assistance (FY 24-25)

illustration of hands holding up people in support

To assist senior citizens and persons with limited mobility, Pennsylvania invests in affordable and accessible transportation alternatives. There is a wide range of shared-ride and public transportation programs available to help Pennsylvania residents enjoy the benefits of alternative transportation regardless of income or physical disability.

  • 26 million fixed-route bus trips for seniors
  • 2.5 million ride-share program trips for seniors
Seniors ride the Transnet Ambler
Driver Wendy helps a senior get onto a shared ride vehicle.

Fixed Route Intelligent Transportation System (FRITS)

The Fixed Route Intelligent Transportation System (FRITS) has been fully implemented at 33 transit agencies providing fixed route transit service in 41 counties throughout the Commonwealth. FRITS provides transit passengers with real-time information on the location and arrival time of the buses through the “myStop” mobile application as well as on transit agency web pages. FRITS technology standardizes the available tools across the Commonwealth so passengers can easily move from one transit service to another. For example, a passenger in Lebanon can travel to Harrisburg using the information from the system to navigate between Lebanon Transit and Rabbittransit. The tools are available to plan their route and find the location of the bus. 

Transit agency personnel have tools available to monitor operation of the vehicles in real-time and react to issues such as detours and traffic to ensure on-time performance and passenger safety. Onboard technology supports drivers and ensures ADA compliance for all passengers. Drivers focus on delivering quality service while the system controls announcements and signage for the passengers while also counting passengers. Reporting tools provide information on performance across the transit agency to inform future decisions as well as providing the data needed for regulatory reporting at all levels. Data is available for miles, hours, and passenger ridership which can be analyzed and filtered in a myriad of ways. 

State Aviation System Plan and Economic Impact Study

PennDOT, in partnership with AECOM, has initiated the 2026 update to the State Aviation System Plan (SASP) and the Aviation Economic Impact Study (AEIS). This comprehensive effort kicked-off in January 2026 and will span an 18-month period. The update encompasses all 119 public-use airports across the Commonwealth. The previous SASP was completed in full in 2016, with a subsequent update in 2019, while the most recent AEIS dates to 2022. These studies are essential for maintaining a safe, efficient, and economically vibrant aviation network that supports statewide aviation goals, infrastructure needs, and emerging trends.

The SASP establishes measurable goals for Pennsylvania's aviation system and outlines strategies to achieve them. A key component of this update is a dedicated hangar study. This focus was prompted by reports from the Pennsylvania aviation community about a statewide hangar shortage. The in-depth analysis will examine the current hangar inventory and associated rates and charges to provide data driven recommendations for addressing capacity constraints. Additionally, the project includes updates to the Economic Impact Calculator—originally launched in 2024 to allow airports to model impacts—and expansions to the GIS Story Map, incorporating new data layers such as regional hangar information. 

The AEIS will quantify the economic contributions of Pennsylvania's airports using direct and multiplier impacts to capture the total economic impact of both the state and individual aviation facilities. Unlike the 2022 study, which incorporated COVID-19 disruptions using pre pandemic (2019) data, the 2026 update will draw on 2025 figures to reflect a more normalized year of aviation operations. By providing current economic assessments, these efforts will support informed investment decisions and highlight aviation's role in job creation and community vitality.   

PennDOT Advances Freight and Passenger Rail

PennDOT developed and submitted the 2025 State Rail Plan to the Federal Railroad Administration (FRA) for review and acceptance in December 2025. This plan outlines the goals and future of freight and passenger rail in Pennsylvania and also highlights the ongoing capital investments that are being constructed. Nationally, Pennsylvania ranks first in number of freight railroads and third in total rail miles. The commonwealth also boasts one of the top state funding programs to support freight rail. The 2025 rail freight program will provide $51 million toward 29 projects.

For passenger rail, efforts are underway for significant investment in the Keystone Corridor as well as a focus on potential new rail service between along two corridors: Scranton and New York City and Reading and Philadelphia/New York City. PennDOT is responsible for funding various improvements along the Keystone Corridor, a state-supported service under the Passenger Rail Investment and Improvement Act of 2008 (PRIIA). Over the last several years, PennDOT has made significant ADA and parking improvements at Keystone passenger rail stations, including extensive projects at Mount Joy, Middletown, Lancaster, and Coatesville.

Mount Joy Station: Completed in 2019, this was the first major station reconstruction project along the Keystone line. This project included elevator/stair towers, high-level platforms, parking, and stormwater improvements.

Middletown Station: Completed in 2022, this new, relocated station included new elevator/stair towers, covered bicycle racks and approximately 400 parking spaces.

Lancaster Parking (Keller Avenue) and Station Pedestrian Bridge: The Keller Avenue parking lot was completed in 2023 and will provide additional parking after completion of an enclosed pedestrian walkway from Keller Avenue parking lot to the station. The pedestrian bridge project includes an elevator/stair tower and covered bicycle parking.

Coatesville Station: Project construction underway to build a new station with ADA accessible platforms, elevator/stair towers, and parking. Once completed, this station will transform the City’s downtown streetscape. 

Alternative Fuels

As of December 2025 there are 755 transit vehicles powered by alternative fuels in operation at Pennsylvania transit agencies.

In 2025, 246 transit vehicles were replaced throughout Pennsylvania with the help of state funding. 

illustration of electric car

Ports and Shipping  (FY 24-25)

Container lifts and containers at the Port of Philadelphia due to PA Intermodal Cargo Growth Incentive Program:

  • 33,689 Added Container Lifts (FY 24-25)
  • 321,883 Total Lifts increased since 2015 

The Erie Port was awarded a $12 million dollar federal grant to expand the slip between their two major terminals. PennDOT Multimodal Transportation Funds will contribute $8 million towards the project. 

Passenger Rail  (FY 24-25)

Keystone corridor passenger trips:

  • Trips on the Keystone Line: 1,293,172
  • Trips on the Pennsylvanian Line: 239,720
  • Total Passenger Rail Trips: 1,532,892

Aviation  (FY 24-25)

Bureau Of Aviation awarded 96 grants totaling $29.3 million:

  • 119 public airports/heliports licensed in PA
  • 16 Scheduled service airports
  • 16 commercial airports
  • 63 federally sponsored airports 

Rail Freight (FY 24-25)

  • 30 Rail Freight Projects (RFAP/RTAP) approved
  • 19 Rail Transportation Assistance Program (RTAP) / Rail Freight Assistance Program (RFAP) projects completed in CY 2025 totaling approximately:
    • 107 miles of track improved or added
    • railroad bridge rehabilitated or replaced
  • 65 operating railroads
  • More than 6,800 miles of track

What about Driver and Vehicle Services?

PennDOT Driver and Vehicle Services administers the state's vehicle registrations, driver's licenses, and IDs. It also oversees programs such as REAL ID, motorcycle safety, and vehicle emission inspections.  Click the link below to learn more about the accomplishments of Driver and Vehicle Services.

2024-2025

Financial Information

The Pennsylvania Department of Transportation overseees programs and policies affecting highways, urban and rural public transportation, airports, railroads, ports, and waterways.

Use arrow keys to choose tabs. Content for the chosen tab will be revealed below.

Revenue Sources (2024 - 2025)

Total Funding: $11,666,117,000

State Funding: $8,581,704,000

SourceAmount
Motor License Fund: Non-Restricted $3,253,811,000
Motor License Fund: Restricted$1,875,184,000
Motor License Fund: Restricted Aviation$10,827,000
Multimodal Fund$191,749,000
Act 44 Public Transportation Trust Fund$2,476,020,000
Act 26 Public Transportation Assistance Fund$267,005,000
Pennsylvania Infrastructure Bank$30,000,000
Lottery Fund$170,907,000
General Fund$130,141,000
General Fund Bonds$175,000,000
Unconventional Gas Well Fund$1,000,000
Organ & Tissue Donation Awareness Fund$60,000

Federal & Other Funding: $3,084,413,000

SourceAmount
Federal Funds: Highways$2,364,042,000
Federal Funds: Pass Through$187,296,000
Federal Funds: Public Transportation and Other$246,475,000
Federal & Other: Aviation$51,977,000
Other Funds: Highways $234,435,000
Federal & Other Funds – Rail Freight$188,000

Revenue Uses (2024 - 2025)

Total Revenue Uses: $11,666,717,000

Highway Related

SourceAmount
Highway & Bridge Maintenance$2,063,896,000
Highway & Bridge Improvement$3,796,066,000
Driver & Vehicle Services$348,147,000
Payments to Local Government$924,430,000
PennDOT Facilities$16,500,000
General Government Operations$87,378,000
Pennsylvania Infrastructure Bank$30,000,000
Refunds & Other$3,590,000
Welcome Centers$4,807,000
Total Highway-Related Uses$7,274,814,000

Multimodal Related

SourceAmount
Aviation $74,404,000
Rail Freight$41,188,000
Mass Transit$2,868,025,000
Rural & Intercity Transit$246,475,000
Free & Shared Ride Transit$170,907,000
Aviation Grants$7,686,000
Rail Freight Grants (EA)$12,806,000
Passenger Rail Grants (EA)$10,246,000
Ports & Waterways Grants (EA)$12,806,000
Bicycle & Pedestrian Facilities Grants Statewide (EA)$2,561,000
Statewide Program Grants (EA)$40,000,000
Multimodal Administration & Oversight (EA)$10,870,000
Transfer to Commonwealth Financial Authority (EA)$94,774,000
Total Multimodal Uses$3,592,748,000

Debt Service & Other Agencies

SourceAmount
Pennsylvania State Police$250,000,000
General Fund Capital Debt$122,584,000
Pennsylvania Turnpike$160,052,000
Motor License Fund Capital Debt: Highway and Bridges$122,677,000
Other Agencies$134,242,000
Tort Payments$9,000,000
Total Debt Service & Other Agencies$798,555,000

Motor License Fund Income (2024 - 2025)

illustration of a dollar

$3,680,814,000

Liquid Fuels Tax

illustration of a dollar

$1,308,088,000

License and Fees

circle with three dots

$112,362,000

Other

circle with three dots

$5,101,264,000

Total State Revenue Utilized

Motor License Fund Expenditures (2024 - 2025)

SourceAmount
Highway Maintenance$1,909,644,000
Highway & Bridge Improvement$1,566,872,000
State Police$250,000,000
Local Subsidy$657,239,000
Driver & Vehicle Services$263,590,000
Other Departments$184,584,000
Turnpike$160,052,000
Other PennDOT$109,283,000

Total State Expenditures: $5,101,264,000

Ways to Connect with PennDOT

Use arrow keys to choose tabs. Content for the chosen tab will be revealed below.

Contact Us

Driver & Vehicle Services Contacts

DVS Contacts

PennDOT Statewide Contacts

PennDOT Staff Director

Submit a State Roadway Concern

Submit a Statewide Roadway Concern

Local PennDOT Offices

Local PennDOT Offices

Subscribe to the DOTcom Newsletter (Monthly)