The Tioga Pathway Project is pipeline project located in Potter and Tioga Counties.

Below is information on DEP's review and approval of the permit applications and other useful project information. The material is presented here to enable the public to readily review the application material, any noted technical deficiencies and the company's responses to the technical deficiencies. Additional materials will be added to the site as the Department continues with its review of the permit applications.  Persons wishing to schedule a file review for this project should contact RPCO.

For those unfamiliar with DEP’s regulatory jurisdiction, DEP has the authority to review and make decisions on permit applications pursuant to environmental regulations such as:

Chapter 102, Erosion and Sediment Control which regulates erosion and sedimentation resulting from earth disturbance activities and the stability of projects.  A pipeline project that exceeds five acres of total earth disturbance must obtain an Erosion Control Permit with plans and practices to control stormwater runoff both during and following earthmoving activities;

Chapter 105, Dam Safety and Waterway Management which regulates water obstructions and encroachments focused on activities located in, along, or across wetlands, lakes, streams and floodways;

For some pipeline projects, DEP also processes a State Water Quality Certification.  Pursuant to Section 401 of the Federal Clean Water Act, DEP will ensure that activities associated with proposed interstate natural gas transmission pipeline projects regulated by the Federal Energy Regulatory Commission (FERC) comply with state water quality standards.  This certification is often authorized conditionally and serves as an index for all DEP water-related permits/approvals that may be required for a pipeline project to demonstrate compliance with state water quality standards.  

The reviews of these permit applications are often coordinated with other DEP Programs including, but not limited to, Clean Water (NPDES Permitting for Discharges from Hydrostatic Testing), Air Quality (Air Quality Permitting), Solid Waste Management, Oil and Gas Management, and Bureau of Mining Programs. DEP may also coordinate the review of these permits with other resource agencies such as County Conservation Districts, the PA Fish and Boat Commission, the PA Game Commission, the PA Department of Conservation and Natural Resources, the PA Department of Agriculture, the PA Historic and Museum Commission, the U.S. Army Corps of Engineers, the U.S. Fish and Wildlife Service and the River Basin Commissions.  Please note that this is not an all-inclusive list of agencies and the type of activity associated with the project will dictate the agencies that will be involved.

DEP’s permitting authority does not cover the determination of the overall pipeline route or property rights .  Other agencies also have jurisdiction over pipelines, such as the Federal Energy Regulatory Commission (FERC), the Pipeline Hazardous Materials Safety Administration (PHMSA), and the Pennsylvania Public Utility Commission (PUC).


 TIOGA PATHWAYS PROJECT OVERVIEW INFORMATION SHEET

This information sheet (PDF) provides a summary of the project. 


 Public Participation Information

STATE WATER QUALITY CERTIFICATION

On November 19, 2024, DEP received a request for a State Water Quality Certification.

CHAPTER 102 AND 105 PERMIT APPLICATIONS

On November 12, 2024, DEP received the following Chapter 102 permit application via Public Upload and on November 7, 2024 DEP received the following Chapter 105 Joint Permit Applications (JPA) via Public Upload.   

On December 23, 2024, DEP sent the following incompleteness review letter to the Applicant for its Chapter 102 permit application.   DEP cannot commence technical review until the applications are complete.