State College Area Connector Moving into Next Phase of Project Development

​Clearfield, PA – Having published the State College Area Connector (SCAC) Planning and Environmental Linkages (PEL) Study, the Pennsylvania Department of Transportation (PennDOT) has requested that the Federal Highway Administration (FHWA) publish a notice of intent to prepare an Environmental Impact Statement. This action would initiate the National Environmental Policy Act (NEPA) Phase of project development, which includes conducting detailed field investigations, traffic analysis, and refining engineering alternatives.

At present, the design team is conducting field investigations. These include, amongst other things, conducting agricultural operation interviews, wetlands delineations, plant and wildlife species surveys, and traffic counts. Experts in the various fields are conducting these investigations.

The design team drafted a newsletter and distributed it to stakeholders who have provided an email address throughout the public involvement process. PennDOT also posted it on the landing page at www.PennDOT.pa.gov/SCAC. Moving forward, the design team plans to distribute this newsletter quarterly.

PennDOT still anticipates hosting a public meeting this summer to present the alternative refinement from the PEL study for the Route 322 corridors as part of the SCAC project. 

Follow PennDOT on Twitter and like the department on Facebook and Instagram

# # #