Project Description

Project Hazelnut is a transformative technology campus located on a 1,300+ acre site primarily in Hazle Township, Luzerne County. The proposed development includes a secure data center with multiple buildings that house different aspects of the its infrastructure – server rooms, power distribution, cooling systems, and network connectivity – all working together to provide a high level of redundancy and scalability.

Point Of Contact

Sponsor: NorthPoint

Name: Brian Stahl

Title: Vice President of Developement

Email: bstahl@northpointkc.com

Phone: 570-417-0031

Website: www.beyondthecontract.com

Permitting Timeline

Legend

Ahead
Delayed
On Time
Planned

To view Permitting Timeline, please turn device sideways (landscape).