DISTRICT 1 PROJECTS

East Side Active Transportation

Erie East Side Active Transportation Image

Project Overview

PennDOT partnered with the Erie Western PA Port Authority to study of the Erie’s East Side community oriented along the Bayfront, the primary focus was from Holland Street through Hess Avenue. 

This study builds on previous planning efforts to identify and evaluate new bicycle and pedestrian connections and improvements in the East Side community within the City of Erie along the Bayfront. 

A steering committee was formed with representatives from the community as well as the Erie Western PA Port authority, the City of Erie, and local organizations and businesses. Recommendations from the committee were presented during a public meeting on August 15. The Final Report on the study is now available for the public to review.

The results of this study can be used by partners to develop strategies for funding and implementation of the selected improvements. 

Public Meeting

PennDOT and the port held an in-person public meeting on the study on August 15 at the Erie Western PA Port Authority, 1 Holland Street, Erie, PA 16507.

 

During the meeting, the design team a gave a presentation on the study, accepted feedback and answered questions. 

 

After the public comment period ends, the feedback received will be added as an appendix to the study report

Resources

FInal Report

Public Meeting Presentation


Accessibility

The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, or have special needs or have special concerns that require individual attention, contact the project manager.


Contact Information

Project Manager, Courtney Lyle

814-678-7046 | clyle@pa.gov

 

Press Officer, Jill Harry

 

814-678-5035 | jharry@pa.gov