Project Overview
The scope of work for the Trumbull Drive Bridge Projects consists of replacement of the existing Trumbull Drive Structure over the Wheeling and Lake Erie Railroad. Traffic control during construction will consist of half width construction, maintaining one lane of traffic controlled by a temporary signal at each end. A temporary sidewalk will also be maintained during construction. In addition to the structure, the project includes approach work, drainage improvements, sidewalk improvements, and utility relocations.
Contact Information
Dina Salemi, P.E.
Design Services Engineer
Phone: 412.429.5079
Email: dsalemi@pa.gov
Mark Young
Environmental Planning Manager
Phone: 412.429.4858
Email: markyoung@pa.gov
Steve Cowan
Press Officer
Phone: 412.334.5436
stcowan@pa.gov
Accessibility
The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the PennDOT Project Manager listed above.