Project Overview
To construct a reliable crossing for pedestrians over Interstate 70 that will provide safe and efficient access across the interstate to serve local residents and maintain connectivity.
A pedestrian detour will be in place during construction.
I-70 will have rolling restrictions when hoisting out the existing bridge and hoisting in the new bridge.
Planned Results
- On-line replacement of existing through truss bridge with similar Thru Truss bridge.
- Vertical clearance improvement over I-70 to 17’-6” or greater.
- ADA compliant access on each end.
Contact Information
Sean P. Sepe, P.E.
Project Manager
(724) 439-7322
ssepe@pa.gov
Laina Aquiline
Press Officer
(724) 415-3748
laquiline@pa.gov
Accessibility
The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the PennDOT Project Manager listed above.