District 2 Projects - Centre County

Bellefonte Interchange Projects

Bellefonte Interchange Projects

Project Overview

County: Centre
State Routes:  I-99, I-80, 26, 220
Local Name: Jacksonville Road
Project Type: Road Construction
Start: June 2020
Completion: Fall 2022

The local interchange project is the first phase of a 3-phase project to build local access, a high-speed interchange connection between I-99 and I-80, and to make improvements on Jacksonville Road. An initial $35 million for the project was announced in July of 2018, coming through an INFRA (Infrastructure for Rebuilding America) grant. It was the only project in PA to be realized through INFRA funding. Completion of all three phases will support regional freight economy and improve the reliability of roadway travel throughout the region.

The overall project will allow for safer travel between I-99, I-80, Route 26, and other local roads. The projects will enhance safety, ease congestion during high traffic times, and help to move goods and services more conveniently. The completed project will connect two critical highway and freight interstates.

The three phases of the project include:

  • The I-80 Local Access Interchange (I-80/A18) will provide direct access between SR 26 and I-80 at a standard diamond interchange and will only be utilized by local traffic destined to SR 26. This project completed mid-December 2022. 
  • The Jacksonville Road Betterment (26/147) will reconstruct and widen SR 26 to maintain and support the State roadway network. It will feature 11-foot travel lanes and 4-foot shoulders. Cost estimate is $6.1 million. It is scheduled to bid in ealy November of 2023
  • The I-80 High Speed Interchange (I-80/B18) will provide a direct connection between I-99 and I-80 via high speed ramps, eliminating the need to travel along SR 26 to access either highway. The stop-controlled intersections will be eliminated with the project and realigned to service local traffic. Cost estimate is $190 million. It is scheduled to bid in early December of 2023.

The reliability of the I-99 and I-80 corridors will be increased due to the direct accesses that the project will provide. By directly connecting I-99 and I-80 and eliminating the stop controlled intersections at the ramp, passenger vehicles, commercial trucks, and other vehicles will be able to arrive to destinations more reliably and safely.

Project Statistics

  • Section A18—Local Interchange
  • Contractor Notice to Proceed:Given June 2020
  • Contract Bid: $51,992,359.02
  • Contractor: HRI, Inc. of State College

Resources

Along with PennDOT's project page, updates can be found on web pages for:

Contact Information

General Contact for All Projects

Timothy Nebgen
Community Relations Coordinator
814-765-0598
tnebgen@pa.gov

Contacts for 1-80/A18

Peter Hall
Inspector in Charge
814-765-0452
pehall@pa.gov

Contacts for I-80/B18

Craig Sattesahn
Design Project Manager
814-765-0678
csattesahn@pa.gov

Contacts for Jacksonville Road Betterment

Steven Rusnak
Design Project Manager
814-765-0418
strusnak@pa.gov

Accessibility

The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the PennDOT Project Manager listed above.