In-Person Public Meeting
Project and Meeting Materials
In-person public meetings will be held Tuesday, April 5 and Wednesday, April 6 from 3:00 PM to 8:00 PM. Tuesday's meeting will be held at Calvary Church in Boalsburg, PA, and Wednesday's meeting will be held at the Centre Hall Fire Station in Centre Hall, PA. View the public meeting flyer (JPG) for more information.
Documents
- State College Area Connector Fact Sheet (PDF)
- Public Meeting Comment Form
- Glossary of Terms (PDF)
- State College Area Connector Project Updates (PDF)
April Meeting Materials
- Welcome Board (PDF)
- Non-Discrimination Statements (PDF)
- State College Area Connector Study Area (PDF)
- Video Viewing Station (PDF)
- Transportation Development Process (PDF)
- Planning and Environmental Linkages Process (PDF)
- Purpose and Need (PDF)
- U.S. 322 Origin and Destination - All Vehicles (PDF)
- U.S. 322 Origin and Destination - Passenger Vehicles (PDF)
- U.S. 322 Origin and Destination - Heavy Trucks (PDF)
- U.S. 322 Origin and Destination - Medium Trucks (PDF)
- Base and Design Year Average Daily Traffic (2017 and 2050) (PDF)
- Build Alternative Design Year Average Daily Traffic (2050) - A (PDF)
- Build Alternative Design Year Average Daily Traffic (2050) - B (PDF)
- Highway Safety Manual Safety Analysis Results (PDF)
- Build Alternative Corridor: Design Considerations (PDF)
- Typical Section Changes (PDF)
- Alternatives Overview (PDF)
- U.S. 322 Layout West (PDF)
- U.S. 322 Layout East (PDF)
- Route 144 Layout North (PDF)
- Route 144 Layout South (PDF)
- U.S. 322 East End Build Alternatives Considerations (PDF)
- East Corridor Potential Impacts (PDF)
- Natural Resource Potential Impacts (PDF)
- Cultural Resource Potential Impacts (PDF)
- Socioeconomic Potential Impacts (PDF)
- Natural Resources (PDF)
- Above Ground Historic Resources (PDF)
- Socioeconomic Resources (PDF)
- Agricultural Resources (PDF)
- Comment Station (PDF)
- Web Map Viewing Station (PDF)
- Engineering Resources (PDF)