Project Overview

County: Wayne County
Municipality: South Canaan Township
Route: 3020
Project Type: Structure Replacement
Proposed Construction Start: Summer 2026
Proposed Construction End: Spring 2027

Designer:
LaBella Associates
1000 Dunham Drive, Suite B
Dunmore, PA 18512

The Pennsylvania Department of Transportation (PennDOT) invites the public to a Public Meeting with Plans Display regarding the Route 3020 Section D50 Culvert Replacement Project in South Canaan Township, Wayne County. The Route 3020 Section D50 project involves improvements to the crossing of Route 3020 (Lake Quinn Road) over an unnamed tributary to Lake Quinn in South Canaan Township, Wayne County. The project proposes to replace the existing concrete slab bridge with a new precast reinforced concrete box culvert.

The existing bridge is experiencing deterioration on the deck and both abutments. The new culvert has been designed to improve the hydraulic performance of the original culvert and maintain the existing floodplains so as not to adversely affect adjacent property owners.  Roadway improvements associated with the project include full depth pavement reconstruction in the vicinity of the culvert, providing lane and shoulder widths meeting current design criteria.  New guide rail and pavement markings that will be provided throughout the project limits.  Aerial utility relocations will be required to accommodate the proposed construction. 

Wetland restoration will be required to restore wetland areas temporarily disturbed during construction.  As part of the environmental restrictions, no tree cutting will be allowed from May 15 through August 15 to accommodate spring staging and fall swarming habitat of the northern long-eared bat.

To view the project virtually, click on the Plans Display on the right side of this page.

Public Meeting

The in-person public display meeting for the project will take place on:
Date: August 7, 2024
Time: 3:30 PM
Location: 2238 Easton Turnpike Waymart PA 18472 (Township Building)

The public comment period is from July 24, 2024 – August 21, 2024. The plans display will be held online and will be available from July 24, 2024 – August 21, 2024. 

The purpose of the plans display is to introduce the project, display and describe the planned traffic control, and receive public input regarding questions or concerns with the project.

The project documents can be made available in alternative languages or formats if requested. If you need translation/interpretation services or have special needs or have special concerns that require individual attention, contact Mr. Thomas Capitano, PennDOT Project Manager, at tcapitano@pa.gov.​

Traffic Control

The project is expected to be built under a 2.6-mile detour, using Route 3022 (Jubinsky Road), Route 296 (Easton Turnpike), and Route 3018 (Cortez Road).  The detour will be in place for approximately 3-4 months to complete construction for this project.

Directions for the detour are given below:

Coming from Cortez Road

  • At the intersection of Route 3018 (Cortez Road) and Route 3020 (Lake Quinn Road), continue straight (east) on Route 3018 (Cortez Road) for 0.4 miles.
  • Turn left at the stop sign intersection of Route 3018 (Cortez Road) and Route 296 (Easton Turnpike).
  • Continue north on Route 0296 (Easton Turnpike) for 1 mile to the intersection of Route 296 (Easton Turnpike) and Route 3022 (Jubinsky Road).
  • Turn left onto Route 3022 (Jubinsky Road).
  • Continue west on Route 3022 (Jubinsky Road) for 1.2 miles to the intersection of Route 3022 (Jubinsky Road) and Route 3020 (Lake Quinn Road).

Coming from Jubinsky Road

  • At the intersection of Route 3022 (Jubinsky Road) and Route 3020 (Lake Quinn Road), continue straight (east) on Route 3022 (Jubinsky Road) for 1.2 miles.
  • At the intersection of Route 3022 (Jubinsky Road) and Route 296 (Easton Turnpike) turn right.
  • Continue south on Route 296 (Easton Turnpike) for 1 mile.
  • At the intersection of Route 296 (Easton Turnpike) and Route 3018 (Cortez Road) turn right.
  • Continue west on Route 3018 (Cortez Road) for 0.4 miles to the intersection of Route 3018 (Cortez Road) and Route 3020 (Lake Quinn Road).

Contact Information

Thomas J. Capitano
PennDOT Project Manager
tcapitano@pa.gov

Jessica Ruddy
PennDOT Press Officer
(570) 963-4044
jeruddy@pa.gov

Title VI

Pursuant to the Title VI of the Civil Rights Act of 1964, PennDOT does not discriminate on the basis of race, color, national origin, gender, age, or disability. If you feel that you have been denied the benefits of, or participation in a PennDOT program or activity, you may contact the PennDOT, Bureau of Equal Opportunity, DBE/Title VI Division at 717-787-5891.​​

Accessibility

The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the PennDOT Project Manager listed above.