Project Overview

County: Susquehanna
Municipality: Auburn Township​
Project Type: Bridge Replacement Project​
Start: September 2024
End: Winter 2025
Last Updated: April 11, 2024

The Pennsylvania Department of Transportation (PennDOT) District 4-0 proposes replacing the bridge on SR 3004 over Unnamed Tributary to Riley Creek, in Auburn Township, Susquehanna County, Pennsylvania. The existing 2 lane concrete slab bridge built in 1930 is 11' in length, has a 25.0 curb-to-curb and a 3.4' underclearance. The proposed project consists of replacing the existing bridge with a new precast reinforced concrete box culvert. Work also includes approach roadway reconstruction and guide rail installation. The proposed traffic control during construction is a detour.

Traffic Control

A detour will be in place during contruction.

Contact Information

Justin Gochenauer
PennDot Project Manager
c-jugochen@pa.gov

Jessica Ruddy
PennDOT Press Officer
570-963-4044
jeruddy@pa.gov