District 4 Projects - Wayne County

Route 296 Bridge Replacement Project

Project Overview

County: Wayne
State Route:  296
Project Type: Bridge Replacement Project
Expected Construction Season:  Summer 2025

The Pennsylvania Department of Transportation (PennDOT) invites the public to a virtual plans display and in-person public plans presentation regarding the State Route 296 (Belmont Turnpike), Section D50 Structure Replacement Project over Van Aucken Creek.

The purpose of the project is to replace the existing structure carrying Belmont Pike over Van Aucken Creek for continued access to local residents, businesses, and emergency services.

The project consists of replacing the existing bridge carrying Route 296 (Belmont Turnpike) over Van Aucken Creek in Waymart Borough, Wayne County with a new box culvert on the same horizontal alignment and similar vertical alignment with minimal approach roadway work. Additionally, new drainage pipes and inlets will be installed.

It is anticipated that construction will take place during the summer of 2025.

Public Meeting

The in-person public display meeting for both projects will take place at: 

Time:  6:00 PM
Date:  August 21, 2024
Location: Gibson Township Building, 11452 PA-92, South Gibson, PA 18842 

Traffic Control

​​​​Vehicles Traveling Along SR 0296 North

Numerous township roads will be signed to advise traffic wishing to travel north along SR 0296 that the road is closed at the bridge. Traffic will be advised to utilize South Street to access SR 3030 (Carbondale Road).

  • South Street westbound to SR 3030 East (Carbondale Road)
  • SR 3030 East (Carbondale Road) will allow vehicles to travel back towards the project location.

The total detour length is approximately 0.5 miles.

Vehicles Traveling Along SR 0296 South

Numerous township roads will be signed to advise traffic wishing to travel south along SR 0296 that the road is closed at the bridge. Traffic will be advised to utilize SR 3030 West (Carbondale Road)

  • SR 3030 West (Carbondale Road) to South Street
  • South Street will allow vehicles to travel back towards the project location.

The total detour length is approximately 0.5 miles.

Pedestrian Detour

Water Street and Center Street (to the west of SR 0296)

Resources

Contact Information

Don Rau
Project Manager
570-221-4924
drau@pa.gov


Jessica Ruddy
Press Officer
(570) 963-4044
jeruddy@pa.gov

Title VI

Pursuant to the Title VI of the Civil Rights Act of 1964, PennDOT does not discriminate on the basis of race, color, national origin, gender, age, or disability. If you feel that you have been denied the benefits of, or participation in a PennDOT program or activity, you may contact the PennDOT, Bureau of Equal Opportunity, DBE/Title VI Division at 717-787-5891.​

Accessibility

The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the PennDOT Project Manager listed above.