Project Overview
County: Lackawanna
Municipality: Olyphant, Dickson City, and Blakely Boroughs
Project Type: Bridge Rehabilitation
Construction Start: Fall 2025
Construction End: Fall 2025
Designer: WRA, LLP
The Route 347 rehabilitation project proposes to provide a concrete deck overlay on the bridge, repair and replace portions of the sidewalk on and adjacent to the bridge, provide an ADA-compliant ramp in the southwest corner, repair damaged portions of the sidewalk railing, and provide protective coatings to the exterior beams. The project also proposes to remove the sediment island around the pier and place rock channeling at the abutments to maintain flow down the center of the channel under low flow conditions. The roadway will be milled and overlayed to match the new deck overlay. No additional roadway improvements are anticipated with this project. Utility conflicts are not anticipated for this project. Temporary right-of-way easements are anticipated at the four corners of the bridge. The flood protection gate at the south side of the bridge will not be affected.
The plans display will be held online and will be available from July 26, 2024, to August 26, 2024.
Removal of the sediment bar is proposed to improve the river's flow capacity under the bridge, and the rock channeling is proposed to prevent sediment bars from forming in the future.
No significant historical or cultural resources are present within the project site. Wetlands are not present within the project limits. Other environmentally sensitive resources will not be affected by the project. The entrance/exit to the Lackawanna River Heritage Trail will be closed at the intersection with Lackawanna Avenue during the sidewalk replacement.
The repairs are expected to be constructed with no significant impact to traffic on Route 347, and access will be maintained to all local businesses. The deck overlay and approach work is proposed to be completed using nighttime operations, maintaining one lane of traffic. Additional daytime shoulder closures and short-term lane shifts will be necessary to complete sidewalk repairs and for equipment access. Construction is expected to be completed in the Fall of 2025.
The purpose of the public plans display is to introduce the project and receive public input regarding the proposed improvements. The public is encouraged to respond to the public questionnaire and provide comments by clicking on the Public Questionnaire to download a printed survey form to be completed by hand and mailed to the address at the bottom of the form.
The project documents can be made available in alternative languages or formats if requested. If you need translation/interpretation services or have special needs or have special concerns that require individual attention, contact Mr. Rich Poplawski, PennDOT Project Manager, at rpoplawski@pa.gov.
The public is encouraged to respond to the public questionnaire and provide comments by clicking on the Public Questionnaire to print a PDF questionnaire to be completed by hand and mailed to the address at the bottom of the form.
Traffic Control
The repairs are expected to be constructed with no significant impact on traffic on Route 347, and access will be maintained to all local businesses.
Contact Information
Rich Poplawski
Project Manager
rpoplawski@pa.gov
Jessica Ruddy
Press Office
(570) 963-4044
jeruddy@pa.gov
Title VI
Pursuant to the Title VI of the Civil Rights Act of 1964, PennDOT does not discriminate on the basis of race, color, national origin, gender, age, or disability. If you feel that you have been denied the benefits of, or participation in a PennDOT program or activity, you may contact the PennDOT, Bureau of Equal Opportunity, DBE/Title VI Division at 717-787-5891.
Accessibility
The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the PennDOT Project Manager listed above.