Project Overview
County: Pike
State Route: Delaware Township
Local Name: Slope Repair
Project Type: January 2022
Anticipated Ending: September 2022
This is a slope failure reconstruction project along SR 2002 (Wilson Hill Road), which is located in the Delaware Water Gap Recreation Area. The proposed work includes the installation of a retaining wall, roadway reconstruction in the eastbound lane, minor roadway work in the opposite lane, guide rail, drainage, and pavement markings. A detour is proposed in order to maintain traffic flow during construction and other miscellaneous work with a total project length of 214 linear feet (0.041 miles), all as indicated on the approved drawings included in the bid package.
Detour
From Milford Road to Route 209:
- Continue north on Milford Road for 2.0 miles;
- Turn right onto Silver Lake Road;
- Continue on Silver Lake Road for 1.2 miles;
- Turn right onto Route 739 South;
- Continue on SR 739 South for 1.2 miles;
- Turn right onto Route 209 South;
- Continue on Route 209 South for .5 miles; and
- The detour will end at the intersection of Wilson Hill Road and Route 209 South.
From Route 209 North to Milford Road:
- Continue north on Route 209 for .5 miles;
- Turn left onto PA Route 739 North;
- Continue on route 739 North for 1.2 miles;
- Turn left onto Silver Lake Road;
- Continue on Silver Lake Road for 1.2 miles;
- Turn left onto Milford Road;
- Continue on Milford Road for 2.0 miles; and
- The detour will end at the intersection of Wilson Hill Road and Milford Road.
Accessibility
The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the PennDOT Project Manager listed above.