Project Overview

The Route 663 (John Fries Highway) SEC VY2 project consists of the approximately 2,640 feet of roadway reconstruction of Route 663 (John Fries Highway) between Milford Square Pike and Mill Hill Road and approximately 800 feet of roadway reconstruction of Allentown Road. 

The project includes reconstruction of the Route 663 (John Fries Highway) and Allentown Road intersection, including adding dedicated left turn lanes at all four approaches, replacement of the Route 663 (John Fries Highway) and Allentown Road bridges over Unami and Licking Creeks, replacement of the traffic signals, as well as drainage and guide rail upgrades. The project is in the final design phase and acquisition of right-of-way, permitting, utility relocation coordination work is underway.

Public Outreach

PennDOT held a virtual public meeting on Thursday, November 30, 2023, for the upcoming project to reconstruct and improve the Route 663 (John Fries Highway) and Allentown Road Intersection and its approaches in Milford Township, Bucks County. The meeting recording and a copy of the presentation can be found under the Resources tab.

​Resources

TIP Visualization Report (PDF)

Detour Plans (PDF)

Project Location Map (PDF)

Plans Display (PDF)

Project Information

County: Bucks
State Route(s): Routes 663 and 4027
Local Names: John Fries Highway, Allentown Road
Project Type: Intersection Improvement
 

Project Contact

Project Manager, Harry Freed, P.E.

Email: hfreed@pa.gov

Phone: 610-205-6981

 

Accessibility

The project documents will be made available in alternative languages or formats if requested. If you need translation/interpretation services, have special needs or have special concerns that require individual attention, contact the PennDOT Project Manager.