Allegheny County

McLaughlin Run Road Bridge Project

McLaughlin Run Road Bridge Project map

Project Status

Step 1:
Development

Step 2:
Design

Step 3:
Construction

Step 4:
Completed

Project Overview

County: Allegheny 
Municipality: Bridgeville Borough
State Route: Route 3004, Section A16
Local Name: McLaughlin Run Road
Project Type: Bridge replacement
Proposed Construction Start: 2026
Proposed Construction End: 2027
Last Updated: 03/10/2025

The purpose of this project is to replace the existing bridge on the same alignment. The project also includes minor approach roadway work, drainage and guiderail updates/upgrades, signing, and pavement markings. Additionally, the purpose of this project is to provide a sustainable crossing on SR 3004 (McLaughlin Run Road) over McLaughlin Run.

Construction for this project is expected to take place in 2026/2027.

Public Outreach

Public Meeting

A public meeting featuring a public plans display and project presentation took place in 2023. Click the button below to view the presentation.

Contact Information

Crystal Magrino
Project Manager
412-429-5031
cmagrino@pa.gov

Mark Young
Environmental Planning Manager
412-429-4858
markyoung@pa.gov

Steve Cowan
Press Officer
412-334-5436
stcowan@pa.gov

Accessibility

The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the PennDOT Project Manager listed above.

Title VI

Pursuant to the Title VI of the Civil Rights Act of 1964, PennDOT does not discriminate on the basis of race, color, national origin, gender, age, or disability. If you feel that you have been denied the benefits of, or participation in a PennDOT program or activity, you may contact the PennDOT, Bureau of Equal Opportunity, DBE/Title VI Division at 717-787-5891.