Project Status
Step 2 of 4
Design
Next Step: Construction
Project Overview
County: Carbon
Municipality: Mahoning Township
State Route: 3005
Local Name: Country Club Road
Project Type: Bridge Replacement
MPMS Number: 11013
Proposed Construction Start: Late 2025
Proposed Construction End: Early 2026
Last Updated: September 2025
The purpose of the project is to maintain a safe crossing of Mahoning Creek on SR 3005 in Mahoning Township that meets current design criteria. The project is needed due to the existing bridge being in poor condition which is governed by the substructure rating. This project is located on SR 3005 Country Club Road in Mahoning Township, Carbon County approximately 4.5 miles West of Lehighton.
Contact Information
Dan Stewart
Project Manager
717-775-3109
c-dastewar@pa.gov
Ronald J. Young, Jr., M.P.A.
Press Officer
610-871-4555
ronyoung@pa.gov
Past Public Outreach
Virtual Plans Display
The virtual plans display is available online to view under the Resources section of this page, but the comment period closed in August 2023.
Accessibility
The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the Project Manager listed above.
Title VI
Pursuant to the Title VI of the Civil Rights Act of 1964, PennDOT does not discriminate on the basis of race, color, national origin, gender, age, or disability. If you feel that you have been denied the benefits of, or participation in a PennDOT program or activity, you may contact the PennDOT, Bureau of Equal Opportunity, DBE/Title VI Division at 717-787-5891.