2025 Detours

Blair County


  • Scope: Structure replacement​
  • Traffic Control: Detour (2.2 miles)​
  • Construction Timeframe: April – December 2025​
  • Detour Implementation Date: June 24, 2025​
  • Anticipated Date Detour to be Lifted: October 2025​
  • Contractor: Cottle’s Asphalt Maintenance, Inc.​
  • Current Contract: $7,434,773​ (Bid with PA 36 Frankstown Road to Mill Run Road)

 

View Route 36 Mill Run Bridge Map (PDF).

 

 

 

 






  • Scope: Structure replacement​
  • Traffic Control: Detour (8.1 miles)​
  • Construction Timeframe: June – July 2026​
  • Detour Implementation Date: June 2, 2026​ 
  • Anticipated Date Detour to be Lifted: July 7, 2026​
  • Contractor: Glenn O. Hawbaker, Inc.​
  • Current Contract: $5,136,136​ (Bid with Route 3013 Blair Gap Run Bridge​)

 

View Route 3013 Dry Run Bridge Map (PDF).

 

 

 

 





Bedford County


  • Scope: Structure Replacement​
  • Traffic Control: Detour – 13.5 miles – Anticipated less than 40 days during school recess​
  • Construction Timeframe: May – August 2025​
  • Detour Implementation Date: July 21, 2025​
  • Anticipated Date Detour to be Lifted: August 18, 2025​
  • Contractor: Wen-Brooke Contracting Inc.​
  • Current Contract: $1,005,163

View the Route 26 over Ravers Run Map (PDF).

 

 

 

 






  • Scope: Structure Replacement and Traffic Signal Upgrade​
  • Traffic Control: Detour – 13.0 miles – Anticipated 112 days ​
  • Construction Timeframe: May – October 2025​
  • Detour Implementation Date: June 2025 (after end 2024-25 school term)​
  • Anticipated Date Detour to be Lifted: September 22, 2025​
  • Contractor: Wen-Brooke Contracting Inc.​
  • Current Contract: $1,618,291

View the Manns Choice Buffalo Run Map (PDF).

 

 

 

 





Cambria County


  • Scope: Bridge rehab - Design/Build
  • Detour Length: East and Westboud Lanes, 6.3 miles
  • Construction Timeframe: As early as Spring 2024 - August 2025
  • Anticipated Detour Implementation Date: April 7, 2025
  • Anticipated Date Detour to be Lifted: May 9, 2025
  • Contractor: Charles J. Merlo, Inc.
  • Current Contract: $3,994,000

 

View the Route 2019 (Level Road) over U.S. 22 Bridge D/B Project Map​ (PDF).​


  • Scope: Bridge Rehabilitation
  • Traffic Control: Detour Route 2101 (5.6 miles) and U.S. 22 nighttime closures
  • Construction Timeframe: April – October 2025
  • Detour Implementation Date: April 2025
  • Anticipated Date Detour to be Lifted: October 2025
  • Contractor: Plum Contracting, Inc.
  • Current Contract: $ 2,888,700.19

View the Route 2101 Cooney Road Bridge Map (PDF).

View the U.S. 22 Overnight Detour Maps for Cooney Road Bridge (PDF).

 

 

 






  • Scope: Resurfacing (5.9 miles)
  • Traffic Control: Short-term flagging, local street detour (0.3 miles), and pedestrian detour
  • Construction Timeframe: April - November 2025
  • Anticipated Detour Implementation Date: April 2025
  • Anticipated Date Detour to be Lifted: September 2025
  • Contractor: Quaker Sales Corporation
  • Current Contract: $ 5,199,141

View the U.S. 219 Ditter's Curve Map (PDF).

 

 

 






  • Scope: Resurfacing, culvert preservation, and slide correction 
  • Traffic Control: Short-term flagging with detours of Route 3007 (6.43 miles) and Flora Street (0.25 miles)
  • Construction Timeframe: April – October 2025
  • Anticipated Detour Implementation Date:  July 14, 2025
  • Anticipated Date Detour to be Lifted: September 21, 2025
  • Contractor: HRI, Inc.
  • Current Contract: $ 3,016,909

View the Route 3007 T337 to Route 56 and Flora Street Detour Map (PDF).

 

 

 






  • Scope: Bridge Rehabilitation
  • Traffic Control: Detour (4.1 miles) 42-day duration
  • Construction Timeframe: April – October 2025
  • Anticipated Detour Implementation: April 2025
  • Anticipated Date Detour to be lifted: May 2025
  • Contractor: Cottle’s Asphalt Maintenance, Inc.
  • Current Contract: $ 788,754.28 (Bid with Jackson St over NS RR and Oak St Over NS RR)

View the T-510 Marra Road Bridge Map (PDF).

 

 

 






  • Scope: Bridge Rehabilitation
  • Traffic Control: Detour (3.5 miles) 49-day duration
  • Construction Timeframe: April – October 2025
  • Anticipated Detour Implementation: May 2025
  • Anticipated Date Detour to be lifted: July 2025
  • Contractor: Cottle’s Asphalt Maintenance, Inc.
  • Current Contract: $ 788,754.28 (Bid with Jackson St over NS RR)

View the Oak Street over Norfolk Southern RR Map (PDF).

 

 

 





Fulton County


  • Scope: Structure Replacement – Precast RC Box Culvert​
  • Traffic Control: Detour – 19.4 Miles – 55 days​
  • Construction Timeframe: April – November 2025​
  • Detour Implementation Date: August 2025​
  • Anticipated Date Detour to be Lifted: October 2025​
  • Contractor: Wen-Brooke Contracting Inc.​
  • Current Contract: $1,147,534

View the South Big Cove Tannery Road over Esther Run Map (PDF).

 

 

 





Huntingdon County


  • Scope: Structure replacement​
  • Bid with Route 305 – U.S. 22 to Route 4004​
  • Traffic Control: Detour (Truck, 40 miles; Local, 0.3 miles)​
  • Construction Timeframe: April – October 2025​
  • Detour Implementation Date: Early September 2025 (21-day maximum duration)​
  • Anticipated Date Detour to be Lifted: By September 27, 2025​
  • Contractor: Cottle’s Asphalt Maintenance, Inc.​
  • Current Contract: $2,150,790​

 

View the Route 305 Derry Run Bridge Map​ (PDF).​

 

Somerset County


  • Scope: Paving, the renovation of multiple bridge-structures, and drainage, guide rail and signage upgrades along five (5) miles of U.S. 219 in Somerset County. 
  • Detours: During the Route 4102 (Sechler Road) bridge-structure renovation, a 6.5-mile detour will divert traffic to Route 281 to Route 4026 (Lake Road) to Route 601 (North Center Avenue) to Gilmour Road (T-861).     During the Route 4104 (Critchfield Road / T-626) bridge-structure renovation, a 2.4-mile detour will divert traffic to Route 601 (Penn Avenue) to Route 4004 (Bicycle Road) to Morris Road (T-548).​ During the 9.4-mile Route 8005 ramps interchange a 14-day detour will use Route 601, Route 4055 and Route 281.   
  • Construction Timeframe: August 2024 - October 2026
  • ​Detour Implementation Dates: April 7, 2025 for appox. 30 days
  • Contractor: New Enterprise Stone & Lime Co., Inc.
  • Current Contract: $25,000,000.00

 

 


  • Scope: Resurfacing, bridge rehabilitations/replacement, drainage and guide rail upgrades (4.7 miles)​
  • Traffic Control: Long-term lane closure w/ short-term ramp detours and side road detours at bridge locations​
  • Construction Timeframe: April 2025 – November 2026​
  • Contractor: New Enterprise Stone & Lime Co., Inc.​
  • Current Contract: $ 24,600,000​

View the Route 8005 Ramp Interchange Map (PDF).

View the Route 8005 Ramp Projects Map (PDF).

View the US 219 to US 30 Bridges Project Map (PDF).

 

 






  • Scope: Two Bridge Replacements​
  • Traffic Control: Detour (12 miles)​
  • Construction Timeframe: May 2025 – September 2025​
  • Anticipated Detour Implementation Date: June 10, 2025​
  • Anticipated Date Detour to be Lifted: August 22, 2025​
  • Contractor: C.H. & D. Enterprises, Inc.​
  • Current Contract: $ 2,566,257  

View the Route 3001 Cucumber Run Bridge Map (PDF).

 

 

 






  • Scope: Bridge Replacement​
  • Traffic Control: Short-Term Flagging & Detour (15.6 miles)​
  • Construction Timeframe: April 2025 – October 2025​
  • Anticipated Detour Implementation Date: July 14, 2025​
  • Anticipated Date Detour to be Lifted: August 14, 2025​
  • Contractor: JVI Group, Inc.​
  • Current Contract: $ 1,102,041  

View the Route 601 Hollsopple Bridge Map (PDF).

 

 

 






  • Scope: Bridge Replacement​
  • Traffic Control: Detour (14.1 miles), 76-day duration​
  • Construction Timeframe: June 2025 – October 2025​
  • Anticipated Detour Implementation Date: June 11, 2025​
  • Anticipated Date Detour to be Lifted: August 25, 2025​
  • Contractor: JVI Group, Inc.​
  • Current Contract: $ 768,827

View the Route 3007 Humbert Road over Smith Run  Bridge Map (PDF).

 

 

 






  • Scope: Bridge Replacement​
  • Traffic Control: Detour (17.2 miles) 17-day duration​
  • Construction Timeframe: May - September 2025​
  • Anticipated Detour Implementation Date: June 10, 2025​
  • Anticipated Date Detour to be Lifted: August 22, 2025​
  • Contractor: Cottle’s Asphalt Maintenance, Inc.​
  • Current Contract: $ 851,400

View the Route 4001 Bakersville Edie Road over Moore Run Bridge Map (PDF).

 

 

 






  • Scope: Bridge Replacement​
  • Traffic Control: Detour (0.8 Miles), Ped. Detour (0.4 Miles) 150-day duration ​
  • Construction Timeframe: June – October 2025​
  • Contractor: A. Merante Contracting Inc.​
  • Current Contract: $1,218,000

View the Route 7422 24th Street over Seese Run Bridge Map (PDF).

 





2024 Detours

Cambria County


  • Scope: Bridge rehab - Design/Build
  • Detour Length: East and Westboud Lanes 6.3 miles
  • Construction Timeframe: As early as Spring 2024 - August 2025
  • Anticipated Detour Implementation Date: TBD
  • Anticipated Date Detour to be Lifted: TBD
  • Contractor: Charles J. Merlo, Inc.
  • Current Contract: $3,994,000


View the Route 2019 (Level Road) over U.S. 22 Bridge D/B Project Map​ (PDF).​

Somerset County


  • Scope: Three Bridge Replacements, One Culvert Replacement
  • Detour Length: 12 miles
  • Construction Timeframe: April 2024 - September 2025
  • Anticipated Detour Implementation Dates: June 11, 2024 & June 10, 2025
  • Anticipated Dates Detours to be Lifted: August 23, 2024 & Auust 22, 2025
  • Contractor: C.H. & D. Enterprises, Inc.
  • Current Contract: $2,566,257


View the Route 3001 Cucumber Run Bridges Project Detour Map​ (PDF).


  • Scope: Resurfacing, Drainage, and Guide Rail Upgrades
  • Detour Length: 51 miles
  • Construction Timeframe: May 2024 - October 2024
  • Anticipated Detour Implementation Dates: TBD - two detours with a 4-day duration and one detour with a 5-day duration
  • Anticipated Dates Detours to be Lifted: TBD
  • Contractor: New Enterprise Stone and Lime Co.
  • Current Contract: $3,349,111


View the PA 31 Barn Swallow Road to Somerset Borough Line Project Detour Map (PDF).