District 6 Projects - Chester County

​​​Boot Road over Amtrak Bridge Replacement Project

Step 3 of 4

Construction

Next Step:  Completed

Project Overview

County: Chester
Municipality: East Caln Township
State Route(s): Route 2020, Route 3061
Local Name(s): Boot Road, Quarry Road
Project Type: Bridge Replacement and Intersection Improvement
MPMS Number: 90612
Construction Start: September 2025
Anticipated Construction End: October 2026
Last Updated: January 2026

This project involves replacing the existing bridge that carries Boot Road over Amtrak. Proposed work also includes approach roadway reconstruction, guide rail and drainage improvements, and intersection improvements at the intersection of Boot Road and Quarry Road. 

The Boot Road bridge is currently posted for a 23-ton weight limit and carries approximately 11,954 vehicles daily.

Bridge Construction

Bridge and roadway construction continues in 2026 on the $13.3 million project to replace the bridge that carries Boot Road over Amtrak in East Caln Township, Chester County. Existing bridge demolition is ongoing. Demolition is scheduled to be completed in February 2026. New bridge construction will follow through the spring and summer.

PennDOT's contractor is replacing the 59-year-old, 193-foot three-span Boot Road bridge with a 105-foot single-span structure. The bridge width will remain the same at 38 feet and improvements will take place on the approach roads to the bridge. Construction also includes resurfacing, stormwater management, and guide rail installation. 

In addition, the roadway profile will be raised slightly to provide additional clearance to Amtrak's facilities. The catenary system used to supply electricity to the railway system, which is currently attached to the bridge, will be re-profiled under the bridge. To enhance traffic flow and safety, additional construction includes improvements at the adjacent Boot Road and Quarry Road Intersection. Work includes widening the roadway to incorporate left-turn lanes on three legs of the intersection, installing modernized traffic signals, and drainage improvements.

Traffic Impacts

A full closure of Boot Road began in late September 2025 for demolition of the existing Boot Road Bridge. Boot Road will be closed between Quarry Road and Southwind Lane for approximately one year. During the Boot Road closure, motorists are directed to use U.S. 322 (Brandywine Avenue), Business U.S. 30 (Lancaster Avenue), and Quarry Road. Trucks are directed to use the posted truck detour. AMTRAK (Keystone Line) and SEPTA (Paoli Thorndale Line) rail service are anticipated to continue without disruptions during construction.

PennDOT will continue to update citizens on the upcoming traffic impacts.

Accessibility

The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the Project Manager listed above.

Title VI

Pursuant to the Title VI of the Civil Rights Act of 1964, PennDOT does not discriminate on the basis of race, color, national origin, gender, age, or disability. If you feel that you have been denied the benefits of, or participation in a PennDOT program or activity, you may contact the PennDOT, Bureau of Equal Opportunity, DBE/Title VI Division at 717-787-5891.