Project Status
Step 1:
Development
Step 2:
Design
Step 3:
Construction
Step 4:
Completed
Project Overview
County: Beaver
Municipality: Economy Borough
State Route: 2005
Local Name: Conway Wallrose Road
Project Type: Slide Remediation
Construction Start: 2025
Proposed Construction End: Fall 2025
Last Updated: 03/26/2025
The scope of work for the Conway Wallrose Slide project consists of reestablishment of the slope, shoulder, guiderail, and to reconstruct part of Conway Wallrose Road. Signing, pavement markings, and drainage improvements within the project area are also included. The project may also include maintenance of the detour route which may include, but not be limited to, roadway patching, milling and resurfacing.
Project Location
Public Outreach
Presentation
Please click the link below to view a PDF of the project presentation.
Contact Information
Jordan Walk
Project Manager
412-429-4923
jorwalk@pa.gov
Mark Young
Environmental Planning Manager
412-429-4858
markyoung@pa.gov
Steve Cowan
Press Officer
412-334-5436
stcowan@pa.gov
Accessibility
The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the PennDOT Project Manager listed above.
Title VI
Pursuant to the Title VI of the Civil Rights Act of 1964, PennDOT does not discriminate on the basis of race, color, national origin, gender, age, or disability. If you feel that you have been denied the benefits of, or participation in a PennDOT program or activity, you may contact the PennDOT, Bureau of Equal Opportunity, DBE/Title VI Division at 717-787-5891.