Mercer County

Route 19 Bridge Replacement (Perry Township)

Photo of Route 19 Bridge

Project Status

Step 1:
Development

Step 2:
Design

Step 3:
Construction

Step 4:
Completed

Project Overview

County: Mercer
Municipality: Perry Township
State Route: 19
Local Name: Perry Highway
Project Type: Bridge Replacement
Last Updated: 01/27/2025

The purpose of the project is to replace the existing bridge that carries Route 19 (Perry Highway) over the Little Shenango River in Perry Township, Mercer County, and to perform improvements to the roadway. The proposed project will include the replacement of the bridge, approach roadway reconstruction, pavement rehabilitation, guide rail replacement, embankment stabilization, drainage improvements and signing/pavement marking upgrades.

The existing four-span rolled steel I-beam bridge was built in 1942 and is classified in poor condition. Approximately 2,100 vehicles use the roadway on average, with 21% truck traffic.

Project Location

The project involves improvements through a 1.1-mile section of Route 19 from the intersection with Route 358 to about 600 feet north of the intersection with Fredonia Road (Route 1001) and Ohle Road in Perry Township, Mercer County.

Route 19 Bridge Replacement project location map

Traffic Impacts

A detour will be required during construction and is expected to be in place for approximately 12 months. The proposed detour for motorized vehicles is 24.5 miles and uses Route 358, Interstate 79, and Route 285.

Within the detour route, Route 19, Route 258 and Route 358 are designated as the Red Detour emergency route for I-79. 

Route 19 is designated Bike Route A. The proposed detour for bicycles uses Fredonia Road and Route 358.

Some work will also require short-term lane restrictions with traffic controlled by flaggers. 

Public Outreach

Public Comment Period

The public comment period, where the community is encouraged to respond with questions and concerns will be from January 27, 2025 through February 10, 2025.

Virtual Plans Display

​The virtual plans display will be available online from January 27, 2025 through February 10, 2025.

Contact Information

Chris Boyer-Krantz 
Project Manager 
814-678-7379
chboyer@pa.gov

Jill Harry
Press Officer
814-678-5035
jharry@pa.gov

Accessibility

The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the PennDOT Project Manager listed above.

Title VI

Pursuant to the Title VI of the Civil Rights Act of 1964, PennDOT does not discriminate on the basis of race, color, national origin, gender, age, or disability. If you feel that you have been denied the benefits of, or participation in a PennDOT program or activity, you may contact the PennDOT, Bureau of Equal Opportunity, DBE/Title VI Division at 717-787-5891.