Greene County

Route 21 Over Toll Gate Run

Project Status

Step 1:
Development

Step 2:
Design

Step 3:
Construction

Step 4:
Completed

Project Overview

County: Greene
Municipality: Borough of Waynesburg
State Route: 21
Local Name: Toll Gate Run
Project Type: Replacement
Proposed Construction Start: 2024
Proposed Construction End: 2025
Last Updated: 12/13/2024

Located in the Borough of Waynesburg – This $3.3 million project consists of the replacement of the existing structure carrying Route 21 over Toll Gate Run with a precast concrete box culvert.  The contractor is Advanced Builders, Inc., and the project is anticipated to be complete in Spring of 2025.

Project Update

12/18/2024 - The project is currently in winter shutdown and anticipated for completion in August 2025.  

11/15/2024 - Temporary roadway paved. The contractor is preparing to start the installation of temporary shoring to start safely excavating for a new precast concrete box culvert in spring 2025.

 

Toll Gate Run photo

Contact Information

Richard Diamond
Project Manager
724-415-1026
ridiamond@pa.gov

Laina Aquiline
Press Officer
724-415-3748
laquiline@pa.gov

Accessibility

The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the PennDOT Project Manager listed above.

Title VI

Pursuant to the Title VI of the Civil Rights Act of 1964, PennDOT does not discriminate on the basis of race, color, national origin, gender, age, or disability. If you feel that you have been denied the benefits of, or participation in a PennDOT program or activity, you may contact the PennDOT, Bureau of Equal Opportunity, DBE/Title VI Division at 717-787-5891.