Project Status
Step 1:
Development
Step 2:
Design
Step 3:
Construction
Step 4:
Completed
Project Overview
The scope of work for the Trumbull Drive Bridge Projects consists of replacement of the existing Trumbull Drive Structure over the Wheeling and Lake Erie Railroad. Traffic control during construction will consist of half width construction, maintaining one lane of traffic controlled by a temporary signal at each end. A temporary sidewalk will also be maintained during construction. In addition to the structure, the project includes approach work, drainage improvements, sidewalk improvements, and utility relocations.
Contact Information
Dina Salemi, P.E.
Design Services Engineer
412-429-5079
dsalemi@pa.gov
Mark Young
Environmental Planning Manager
412-429-4858
markyoung@pa.gov
Steve Cowan
Press Officer
412-334-5436
stcowan@pa.gov
Accessibility
The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the PennDOT Project Manager listed above.
Title VI
Pursuant to the Title VI of the Civil Rights Act of 1964, PennDOT does not discriminate on the basis of race, color, national origin, gender, age, or disability. If you feel that you have been denied the benefits of, or participation in a PennDOT program or activity, you may contact the PennDOT, Bureau of Equal Opportunity, DBE/Title VI Division at 717-787-5891.