Project Status
Step 1:
Development
Step 2:
Design
Step 3:
Construction
Step 4:
Completed
Public Outreach
Public Comment Period
The public comment period, where the community is encouraged to respond with questions and concerns will be from April 3, 2025 through April 17, 2025.
Virutal Plans Display
The virtual plans display will be available online from April 3, 2025 through April 17, 2025.
Project Overview
County: Fayette
Municipality: Various
State Route: 21, 40, 119
Local Name: Roy E. Furman Highway, National Pike, and Morgantown Road / North Main Street
Project Type: Epoxy Overlay
Proposed Construction Start: 2025
Proposed Construction End: 2025
Last Updated: 04/01/2025
The Fayette County Epoxy Overlay 2025 project will add a 3/8” epoxy overlay on three Fayette County bridges: PA 21 over Monongahela River at Masontown, US 40 over Youghiogheny River Lake near Markleysburg, and US 119 over Cheat River at Point Marion.
Additional work will include cleaning and flushing the structure drainage, joint cleaning and sealing, barrier sealing, concrete sidewalk repairs (119-19M), replace pavement markings and missing signage. Traffic will be maintained with short-term lane closures.
Contact Information
Ryan Progin
Project Manager
724-430-4408
ryprogin@pa.gov
Laina Aquiline
Press Officer
724-415-3748
laquiline@pa.gov
Accessibility
The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the PennDOT Project Manager listed above.
Title VI
Pursuant to the Title VI of the Civil Rights Act of 1964, PennDOT does not discriminate on the basis of race, color, national origin, gender, age, or disability. If you feel that you have been denied the benefits of, or participation in a PennDOT program or activity, you may contact the PennDOT, Bureau of Equal Opportunity, DBE/Title VI Division at 717-787-5891.