Project Overview
County: Lackawanna
Project Type: Rehabilitation
Start Month: April 2023
End Month: Fall 2024
Cost: $30 Million
Contractor: Kriger Construction
Last Updated: July 18, 2023
This is a Concrete Pavement and Bridge Structure Preservation Project. This project will address the aging concrete roadway pavement by replacing damaged and broken slabs where necessary while retrofitting existing slabs to give them stability, replace damaged or missing pavement joints and the final surface will be diamond ground to make the most of ride quality. The same preservation activities will be applied to all ramp legs along the length of the highway. The bridge structures along the mainline and interchange ramps will receive preventative maintenance work to increase the service life and prevent future deterioration.
Contact Information
James Borino
PennDOT Project Manager
jborino@pa.gov
Jessica Ruddy
PennDOT Press Officer
(570) 963-4044
jeruddy@pa.gov
Accessibility
The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the PennDOT Project Manager listed above.