Project Overview

County: Lebanon
State Route: 3025-000 (Local)
Local Name: Relocation of South 22nd Street Bridge over Quittapahilla Creek Project​
Project Type: Bridge Replacement
Proposed Start Month: February​ 2026
Proposed End Month: March 2027
Last Updated: September 2024

Lebanon County in partnership with PennDOT District 8-0 and North Cornwall Township is proposing to realign South 22nd Street at the Chestnut Street intersection, and to construct a new South 22nd Street bridge, downstream in North Cornwall, North Lebanon, and West Lebanon Townships, Lebanon County. The new bridge will be located downstream approximately 150-feet and will include a 10-foot wide pedestrian access for connection to the US 422 corridor and the Lebanon Valley Rail Trail.

The purpose of this project is to improve safe movements at the intersection of South 22nd Street and Chestnut Street as well as to increase pedestrian connectivity along South 22nd Street. In addition, this project (Lebanon Valley Rail Trail (LVRT) Phase 6C) will seek to lengthen the LVRT Network and eliminate the periodic closure of South 22nd Street which is caused by the flooding of the Quittapahilla Creek over the roadway.

A public meeting will be held on 10/01/2024 at 7 pm to 7:30 pm​ at the North Cornwall Township Office, 330 South 18th Street, Lebanon, PA 17042.​​

 

Contact Information

Cathy Longenecker
Project Manager
(717) 216-5293
c-clongene@pa.gov

David M Thompson
Press Officer
(717) 787-1446
dmthompson@pa.gov​​​​​​

Accessibility

The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the PennDOT Project Manager listed above.